Harbour Air South TerminalRemove and backfill 2 underground storage tanks for Avgas.Move and recondition Jet fuel tank for re-use.

Pour concrete pad with Petroleum Transfer area, catch basin and Oi-Water Separator.

Install new 15,00L aboveground avgas tank.

Manufacture and install fueling skid to tie in to underground piping to dock fueling and provide fueling at the ramp.

Install fully customizable PLC electronic control system for system authorization, timers and alarms.