SITE REHABILITATION & SYSTEM INSTALLATION
AGFT completed a full site excavation and rehabilitation followed by a new Jet A tank and cabinet.
System Features:
- Complete excavation of affected area following a fuel spill
- Shoring of excavation down to water table
- Refill and compaction of affected area
- New Jet cabinet with 35,000 L fuel tank built on top of full-size concrete pad