SITE REHABILITATION & SYSTEM INSTALLATION

AGFT completed a full site excavation and rehabilitation followed by a new Jet A tank and cabinet.

System Features:
  • Complete excavation of affected area following a fuel spill
  • Shoring of excavation down to water table
  • Refill and compaction of affected area
  • New Jet cabinet with 35,000 L fuel tank built on top of full-size concrete pad